Hawaii: Difference between revisions

Jump to navigationJump to search
Line 15: Line 15:
==Metro and light rail systems==
==Metro and light rail systems==
===Honolulu===
===Honolulu===
The first section of the [https://honolulutransit.org/ HART] (Honolulu Authority for Rapid Transportation) metro line - 17.7km from East Kapolei to Aloha Stadium - . opened to public traffic on 1 July 2023. The second phase - 8.3km from Aloha Stadium to Middle Street-Kalihi Transit Center - is expected to be operational in 2025.
The first section of the [https://honolulutransit.org/ HART] (Honolulu Authority for Rapid Transportation) metro line - 17.7km from East Kapolei to Aloha Stadium - . opened to public traffic on 1 July 2023. The second phase - 8.3km from Aloha Stadium to Middle Street-Kalihi Transit Center - is expected to be operational in 2025. The line is standard gauge with 750V third-rail electrification.
See also [https://www.urbanrail.net/am/hono/honolulu.htm UrbanRail].


'''Infrastructure'''
* Gauge: standard
* Electrification: 750V DC third-rail
* Rule of the road: right
<!--
====Information====
* Map:
* Journey planner:
* Timetable:
* Engineering work:
-->
See also [https://www.urbanrail.net/am/hono/honolulu.htm UrbanRail].
<!--
==Recent and Future Changes==
==Recent and Future Changes==
===Recent Changes===
===Recent Changes===
DETAILS
None


=== Future Changes===
=== Future Changes===
DETAILS
None
-->


==Obscure or Sparse Passenger Services==
==Obscure or Sparse Passenger Services==

Revision as of 17:37, 27 September 2025

State Details

See Wikipedia; also see United States for information relating to the country as a whole, and the national operator Amtrak.

Maps

Hawaii is covered by the SPV "North America Railroad Atlas" volume Pacific Northwest.

Rail Operators

There are no main-line rail services in Hawaii.

Tourist Lines

Metro and light rail systems

Honolulu

The first section of the HART (Honolulu Authority for Rapid Transportation) metro line - 17.7km from East Kapolei to Aloha Stadium - . opened to public traffic on 1 July 2023. The second phase - 8.3km from Aloha Stadium to Middle Street-Kalihi Transit Center - is expected to be operational in 2025. The line is standard gauge with 750V third-rail electrification. See also UrbanRail.

Recent and Future Changes

Recent Changes

None

Future Changes

None

Obscure or Sparse Passenger Services

None known.

See also