Hawaii: Difference between revisions
Jump to navigationJump to search
Paul Griffin (talk | contribs) |
Paul Griffin (talk | contribs) |
||
Line 15: | Line 15: | ||
==Metro and light rail systems== | ==Metro and light rail systems== | ||
===Honolulu=== | ===Honolulu=== | ||
The first section of the [https://honolulutransit.org/ HART] (Honolulu Authority for Rapid Transportation) metro line - 17.7km from East Kapolei to Aloha Stadium - . opened to public traffic on 1 July 2023. The second phase - 8.3km from Aloha Stadium to Middle Street-Kalihi Transit Center - is expected to be operational in 2025. | The first section of the [https://honolulutransit.org/ HART] (Honolulu Authority for Rapid Transportation) metro line - 17.7km from East Kapolei to Aloha Stadium - . opened to public traffic on 1 July 2023. The second phase - 8.3km from Aloha Stadium to Middle Street-Kalihi Transit Center - is expected to be operational in 2025. The line is standard gauge with 750V third-rail electrification. | ||
See also [https://www.urbanrail.net/am/hono/honolulu.htm UrbanRail]. | |||
==Recent and Future Changes== | ==Recent and Future Changes== | ||
===Recent Changes=== | ===Recent Changes=== | ||
None | |||
=== Future Changes=== | === Future Changes=== | ||
None | |||
==Obscure or Sparse Passenger Services== | ==Obscure or Sparse Passenger Services== |
Revision as of 17:37, 27 September 2025
State Details
See Wikipedia; also see United States for information relating to the country as a whole, and the national operator Amtrak.
Maps
Hawaii is covered by the SPV "North America Railroad Atlas" volume Pacific Northwest.
Rail Operators
There are no main-line rail services in Hawaii.
Tourist Lines
- Hawaiian Railway Society Operate trains for 6.5 miles from Ewa Beach to Kahe Point on Oahu Island. The gauge is 3 ft (914 mm).
- The Grove Farm Sugar Plantation Museum in Kauaʻi. Gauge 2ft 6in (762 mm)
- Kauaʻi Plantation Railway at Kilohana. The Kauaʻi Plantation Railway follows a 3-mile (4.8 km) loop through agricultural displays on the historic Kilohana estate and plantation. The Kauaʻi Plantation Railway is 3 ft (914 mm) gauge.
Metro and light rail systems
Honolulu
The first section of the HART (Honolulu Authority for Rapid Transportation) metro line - 17.7km from East Kapolei to Aloha Stadium - . opened to public traffic on 1 July 2023. The second phase - 8.3km from Aloha Stadium to Middle Street-Kalihi Transit Center - is expected to be operational in 2025. The line is standard gauge with 750V third-rail electrification. See also UrbanRail.
Recent and Future Changes
Recent Changes
None
Future Changes
None
Obscure or Sparse Passenger Services
None known.